Task 1
A team of 12 people fulfilled the standard for the production of soda ash, having produced 1.5 thousand tons in a month. Determine the production of one worker.
Task 9
During the year, the volume of production of washing powder increased by 12.5%, and the number of employees in the workshop of workers - by 1%.
Task 18
The technological process of the plastics casting site is planned to be produced on the injection molding machine No. 1 - 800 pcs. parts, and the injection molding machine number 2 - 1500 pcs. the same products. The complexity of manufacturing products on the first machine - 0.3 man-hours, on the second - 0.15 man-hours per product.
Determine the average complexity of manufacturing products on the site.
Task 22
By the beginning of the planned period, the technological complexity of the product was 2.5 standard-hours, its planned release was 950 pcs. In accordance with the plan of organizational and technical measures (taking into account the implementation period), a reduction in the labor intensity of products is envisaged by 650 standard-hours. Determine the planned technological complexity of the product.
Task 26
Instant observations were carried out in the shop at 20 workplaces of painters. Their load factor was assumed to be 0.8. Possible error in the observation results - 4%.
Determine the required amount of observation, the number of detours for photographing by the method of moment observations in mass production.
Task 27
Determine the number of moments (measurements) and detours for photographing by the method of moment observations in mass production conditions, if the load factor of apparatchiks (Kz) on the site on average is 0.7; the number of workers CR = 30 people; the permissible value of the relative error of the results of the observations is P = 8%.
Problem 35
It is required to determine the production rate of the apparatchik servicing the batch apparatus, if the operational time is 40 minutes, the workplace maintenance time is 15 minutes, per shift, the shift duration is 495 minutes, 200 kg of products are produced per operation.
Task 36
It is required to determine the production rate of the apparatchik servicing the continuous apparatus, if during the eight-hour shift the apparatus was in scheduled preventive repair for 1 hour, and during an hour of work it releases 1.2 tons of products.
Task 48
Turner of the 4th category used in the organization of the tariff grid in the current month were assigned to perform work qualified (related) to the 4th category. In total, they worked 140 hours. The hourly wage rate for the 4th category of the tariff scale used in the organization is 34 rubles.
Calculate the amount of wages per month from the calculation of the tariff rate.
Problem 50
Determine the monthly salary of a worker of category VI with a time-bonus system of remuneration. The hourly wage rate of a worker (MF) is 40 rubles, he has worked 171 hours per month (Totr), the premium for the high-quality